test suite failures. The failures occur at each stage, and only get
worse, so I'm reverting all of them.
Please resubmit these patches, one at a time, after verifying that the
regression test suite passes. Never submit a patch without running the
regression test suite.
llvm-svn: 155372
There is an assert at line 558 in ScheduleDAGInstrs::buildSchedGraph(AliasAnalysis *AA).
This assert needs to addressed for post RA scheduler. Until that assert is addressed,
any passes that uses post ra scheduler will fail. So, I am temporarily disabling the
hexagon tests until that fix is in.
The assert is as follows:
assert(!MI->isTerminator() && !MI->isLabel() &&
"Cannot schedule terminators or labels!");
llvm-svn: 154617
* Removed test/lib/llvm.exp - it is no longer needed
* Deleted the dg.exp reading code from test/lit.cfg. There are no dg.exp files
left in the test suite so this code is no longer required. test/lit.cfg is
now much shorter and clearer
* Removed a lot of duplicate code in lit.local.cfg files that need access to
the root configuration, by adding a "root" attribute to the TestingConfig
object. This attribute is dynamically computed to provide the same
information as was previously provided by the custom getRoot functions.
* Documented the config.root attribute in docs/CommandGuide/lit.pod
llvm-svn: 153408
This new scheduler plugs into the existing selection DAG scheduling framework. It is a top-down critical path scheduler that tracks register pressure and uses a DFA for pipeline modeling.
Patch by Sergei Larin!
llvm-svn: 149547