The member LastSchedule was never set, such that printScop would always
print "n/a" instead of the last schedule.
To ensure that the isl_ctx lives as least as long as the stored
schedule, also store a shared_ptr.
Also set the schedule tree output style to ISL_YAML_STYLE_BLOCK to avoid
printing everything on a single line.
`opt -polly-opt-isl -analyze` will be used in the next commit.
In ScheduleOptimizer::isTileableBand(), allow the case in which
the band node's child is an isl_schedule_sequence_node and its
grandchildren isl_schedule_leaf_nodes. This case can arise when
two or more statements are fused by the isl scheduler.
The tile_after_fusion.ll test has two statements in separate
loop nests and checks whether they are tiled after being fused
when polly-opt-fusion equals "max".
Reviewers: grosser
Subscribers: gareevroman, pollydev
Tags: #polly
Contributed-by: Theodoros Theodoridis <theodort@student.ethz.ch>
Differential Revision: https://reviews.llvm.org/D30815
llvm-svn: 297587